Commercial Builds


Tots Creche,
Maynooth, Co. Kildare
Completed 2024
-Click here to see more-

Bishopsland,
Ballymore Eustace, County Kildare
Completed 2025
-Click here to see more-

Burkes Pharmacy,
Naas, Co. Kildare Completed 2025
-Click here to see more-


St. Fintans Child and Adolescent Mental Health unit, Portlaoise, Co. Laois
Completed 2024

Referee Trevor Robinson, RKD Architects.
Renovation and upgrade of a HSE facility, which is a protected structure. The project incorporated a kitchen, three offices, a section corridor and a stairwell. Demolition to turn key finish using lime mortar finish.
This was a live site with both staff and patients on site for the duration of the project.

St. Fintans Child and Adolescent Mental Health unit, Portlaoise, Co. Laois
Completed 2024

Referee Trevor Robinson, RKD Architects.
Renovation and upgrade of a HSE facility, which is a protected structure. The project incorporated a kitchen, three offices, a section corridor and a stairwell. Demolition to turn key finish using lime mortar finish.
This was a live site with both staff and patients on site for the duration of the project.


Bunscoil Bhride,
Rathangan, Co. Kildare
Completed 2020

Referee; Mel Mcloughlin (Architect), Maria Rogerson (Principal)
Summary; During the school term (September to November) we successfully made alterations within the school to create a new safe space room, multi-sensory room, accessible bathroom, office and classroom as well as building a new 200m2 Wet Pour Rubber Surface Play Area to the rear of the school

Bunscoil Bhride,
Rathangan, Co. Kildare
Completed 2020

Referee; Mel Mcloughlin (Architect), Maria Rogerson (Principal)
Summary; During the school term (September to November) we successfully made alterations within the school to create a new safe space room, multi-sensory room, accessible bathroom, office and classroom as well as building a new 200m2 Wet Pour Rubber Surface Play Area to the rear of the school


St Marys Hall, Portlaoise

Six days from start to finish for St Marys Hall, Portlaoise. We are glad to have the Portlaoise Panthers basketball club training again in dry conditions For the repair Roof barge flashing, gutters and down-pipes were removed and replaced with new high-rise 0.7 PVC coated gutters, 0.7 PVC coated pressed barge flashing were mechanically fixed to concrete gable walls and 100mm down-pipes were fitted with existing crash protection cages. The existing insulated panel and its fixings were removed and repaired. 1.2mm steel top batt purlins were mechanically fixed with EJOT Sapin self-tapper fixings to all of the high panel points. The existing roof panels were cut back and flush with existing steel RSJ. New 0.7 PVC coated metal was pressed and fixed to cover existing steel as a Fascia detail. A Bird guard was fitted as a precaution to keep high airflow volume. A 0.7 PVC box profile sheeting was fitted to the top batt. The Ridgeline is fitted with 0.7 PVC coated capping and foam fillers. All of these works were carried out to certification and specification. 

St Marys Hall, Portlaoise

Six days from start to finish for St Marys Hall, Portlaoise. We are glad to have the Portlaoise Panthers basketball club training again in dry conditions For the repair Roof barge flashing, gutters and down-pipes were removed and replaced with new high-rise 0.7 PVC coated gutters, 0.7 PVC coated pressed barge flashing were mechanically fixed to concrete gable walls and 100mm down-pipes were fitted with existing crash protection cages. The existing insulated panel and its fixings were removed and repaired. 1.2mm steel top batt purlins were mechanically fixed with EJOT Sapin self-tapper fixings to all of the high panel points. The existing roof panels were cut back and flush with existing steel RSJ. New 0.7 PVC coated metal was pressed and fixed to cover existing steel as a Fascia detail. A Bird guard was fitted as a precaution to keep high airflow volume. A 0.7 PVC box profile sheeting was fitted to the top batt. The Ridgeline is fitted with 0.7 PVC coated capping and foam fillers. All of these works were carried out to certification and specification. 


Music Generation (School of Music),
Portlaoise, Co.Laois

Completed 2022, €1.2m+vat

Full energy upgrade of whole school building including new insulated torch on roof over
existing, al new windows and external doors, external insulation system with finished render,
full rewire and re plumb (Air to Water Heating System), full redecoration.

Music Generation (School of Music),
Portlaoise, Co.Laois

Completed 2022, €1.2m+vat

Full energy upgrade of whole school building including new insulated torch on roof over
existing, al new windows and external doors, external insulation system with finished render,
full rewire and re plumb (Air to Water Heating System), full redecoration.


Braemar Construction Ltd
Company registration no: 667477

info@terryhigginsbuilders.com